Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups

Menezes, A. A., Clark, A. and Almada-Lobo, B. (2010) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136

This is the latest version of this item.

[img]
Preview
PDF - Accepted Version
245kB

Publisher's URL: http://dx.doi.org/10.1007/s10951-010-0197-6


Item Type:Article
Additional Information:The original publication is available at www.springerlink.com
Uncontrolled Keywords:lot-sizing and scheduling, nontriangular setups, setup crossover, integer programming
ID Code:14172
Deposited By: Dr A. Clark
Deposited On:25 Oct 2011 15:28
Last Modified:23 May 2014 17:22

Available Versions of this Item

Request a change to this item

Total Document Downloads in Past 12 Months

Document Downloads

Total Document Downloads

More statistics for this item...
Copyright 2013 © UWE better together