Factors influencing construction time and cost overruns on high-rise projects in Indonesia

Kaming, P. F., Olomolaiye, P., Holt, G. D. and Harris, F. C. (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15 (1). pp. 83-94. ISSN 0144-6193 Available from: http://eprints.uwe.ac.uk/20043

Full text not available from this repository

Publisher's URL: http://www.routledge.com/


Item Type:Article
Uncontrolled Keywords:economic theory, construction costs, studies, LDCs, construction industry, Indonesia
Faculty/Department:Faculty of Environment and Technology
ID Code:20043
Deposited By: M. Clarke
Deposited On:20 May 2013 13:50
Last Modified:21 May 2016 11:56

Request a change to this item