| Login |
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
Araujo, S. A. , Arenales, M. N. and Clark, A. (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. Journal of Heuristics, 13 (4). pp. 337-358. ISSN 1381-1231 Full text not available from this repository Publisher's URL: http://dx.doi.org/10.1007/s10732-007-9011-9
Repository Staff Only: item control page |










