Menu
Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: A | C | F | M
Number of items: 5.

A

Almada-Lobo, B., Clark, A., Guimarães, Luís, Figueira, Gonçalo and Amorim, P. (2015) Industrial insights into lot sizing and scheduling modeling. Pesquisa Operacional, 35 (3). pp. 439-464. ISSN 1678-5142 Available from: http://eprints.uwe.ac.uk/28588

C

Clark, A., Almada-Lobo, B. and Almeder, C. (2011) Editorial: Lot sizing and scheduling: Industrial extensions and research opportunities. International Journal of Production Research, 49 (9). pp. 2457-2461. ISSN 0020-7543 Available from: http://eprints.uwe.ac.uk/15840

F

Ferriera, D., Clark, A., Almada-Lobo, B. and Morabito, R. (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics, 136 (2). pp. 255-265. ISSN 0925-5273 Available from: http://eprints.uwe.ac.uk/17607

M

Menezes, A. A., Clark, A. and Almada-Lobo, B. (2011) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136 Available from: http://eprints.uwe.ac.uk/11483

Menezes, A. A., Clark, A. and Almada-Lobo, B. (2010) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136 Available from: http://eprints.uwe.ac.uk/14172

This list was generated on Tue Aug 30 02:29:40 2016 BST.

 

Copyright 2016 © UWE better together