| Login |
Browse by Creator
Jump to: Article Number of items: 4. ArticleFerriera, D. , Clark, A. , Almada-Lobo, B. and Morabito, R. (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics, 136 (2). pp. 255-265. ISSN 0925-5273 Clark, A. , Almada-Lobo, B. and Almeder, C. (2011) Editorial: Lot sizing and scheduling: Industrial extensions and research opportunities. International Journal of Production Research, 49 (9). pp. 2457-2461. ISSN 0020-7543 Menezes, A. A. , Clark, A. and Almada-Lobo, B. (2011) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136 Menezes, A. A. , Clark, A. and Almada-Lobo, B. (2010) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136 This list was generated on Fri May 24 02:50:43 2013 BST. |











