Menu
Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Number of items: 2.

Araujo, S. A. d. and Clark, A. (2013) A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing. Computers and Industrial Engineering, 65 (4). pp. 577-585. ISSN 0360-8352 Available from: http://eprints.uwe.ac.uk/17611

Araujo, S. A. d., Arenales, M. N. and Clark, A. (2008) Lot-sizing and furnace scheduling in small foundries. Computers and Operations Research, 35 (3). pp. 916-932. ISSN 0305-0548 Available from: http://eprints.uwe.ac.uk/7378

This list was generated on Wed May 25 03:30:45 2016 BST.

 

Copyright 2016 © UWE better together