Menu
Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Number of items: 8.

Sheppard, A. and Askew, J. (2015) Law and disorder: Permitted development rights and the loss of proportionate control. In: AESOP 2015: Definite space – fuzzy responsibility, Prague, Czech Republic, 14 - 16 July 2015. Available from: http://eprints.uwe.ac.uk/28099

Hobma, F., Askew, J., Mitschang, S., Santing, J., Schwarz, T., Sheppard, A. and Verbist, S. (2014) Internationale vergelijking financiering en kostenverhaal bij organische gebiedsontwikkeling (International comparison of funding and cost recovery in organic area development). Technical Report. TU Delft. Available from: http://eprints.uwe.ac.uk/28095

Askew, J., King, L., McClymont, K., Roberts, H., Sinnett, D. and Smith, N. (2011) Green infrastructure in urban areas. Technical Report. Royal Instute of Chartered Surveyors, Coventry. Available from: http://eprints.uwe.ac.uk/15503

Askew, J. and Parkhurst, G. (2010) Popular regulations for popular appeal: Excessive haste by the government to address climate change? PROJECT, Journal of the Department of Planning and Architecture, 2. pp. 87-89. Available from: http://eprints.uwe.ac.uk/19592

Sheppard, A., Askew, J., Dalton, A., Baker, N., Appleby, T. and Peel, D. (2008) A review of mobile phone operators permitted development rights. Project Report. Welsh Assembly Government, Bristol. Available from: http://eprints.uwe.ac.uk/13347

Askew, J. (2004) The agency project: A case study. CEBE Transactions, 1 (1). pp. 8-26. ISSN 1745-0322 Available from: http://eprints.uwe.ac.uk/9119

Askew, J. (2004) Mast location debate rages. Planning. ISSN 0001-2610 Available from: http://eprints.uwe.ac.uk/9118

Askew, J. (2004) Mobile phone masts. Report of an inquiry by the all party mobile group. Technical Report. ApMobile, London. Available from: http://eprints.uwe.ac.uk/10309

This list was generated on Mon Jul 25 02:26:52 2016 BST.

 

Copyright 2016 © UWE better together