Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping | Creators | Date
Jump to: 2012 | 2010 | 2009 | 2008
Number of items: 4.

2012

Ferriera, D., Clark, A., Almada-Lobo, B. and Morabito, R. (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics, 136 (2). pp. 255-265. ISSN 0925-5273

2010

Clark, A., Morabito, R. and Toso, E. A. V. (2010) Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching. Journal of Scheduling, 13 (2). pp. 111-121. ISSN 1094-6136

2009

Toso, E. A. V., Morabito, R. and Clark, A. (2009) Lot-sizing and sequencing optimisation at an animal-feed plant. Computers and Industrial Engineering, 57 (3). pp. 813-821. ISSN 0360-8352

2008

Toso, E. A. V., Morabito, R. and Clark, A. (2008) Combinação de abordagens GLSP e ATSP para o problema de dimensionamento e sequenciamento de lotes de produção de suplementos para nutrição animal. Pesquisa Operacional, 28 (3). pp. 423-450. ISSN 0101-7438

This list was generated on Tue Oct 21 03:00:00 2014 BST.
Copyright 2013 © UWE better together