| Login |
Browse by Creator
|
| Login |
Jump to: Article Number of items: 1. ArticleClark, A., Mahdieh, M. and Rangel, S. (2012) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. To be published in International Journal of Production Economics. ISSN 0925-5273 [In Press] This list was generated on Wed Dec 5 02:31:04 2012 GMT. |

