Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: Article
Number of items: 1.


Clark, A., Mahdieh, M. and Rangel, S. (2014) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research, 52 (8). pp. 2490-2503. ISSN 0020-7543 Available from:

This list was generated on Tue Nov 24 03:27:16 2015 GMT.


Copyright 2015 © UWE better together