Menu
Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: Article
Number of items: 1.

Article

Clark, A., Mahdieh, M. and Rangel, S. (2014) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research, 52 (8). pp. 2490-2503. ISSN 0020-7543 Available from: http://eprints.uwe.ac.uk/27459

This list was generated on Sat Oct 1 02:53:30 2016 BST.

 

Copyright 2016 © UWE better together