Number of items: 5.
A
Ali, K. N. , Sun, M. , Petley, G. and Barrett, P.
(2002)
Improving the business process of reactive maintenance projects.
Facilities, 20 (7/8).
pp. 251-261.
ISSN 0263-2772
Available from: http://eprints.uwe.ac.uk/8887
Ali, K. N. , Sun, M. and Barrett, P.
(2001)
Knowledge management for tools for minor maintenance projects in the UK.
In:
Proceedings of the First International Postgraduate Conference in the Built and Human Environment, University of Salford, Manchester, UK, 15th - 17th March, 2001.
Available from: http://eprints.uwe.ac.uk/9443
M
Motawa, I. , Anumba, C. J. , El-Hamalawi, A. , Sun, M. , Chung, P. W. H. and Yeoh, M.
(2003)
A fuzzy model for change prediction in construction projects.
In:
10th EG-ICE International Workshop on Intelligent Computing in Engineering (European Group for Intelligent Computing in Engineering), Delft University of Technology, Delft, The Netherlands, July 2003.
Available from: http://eprints.uwe.ac.uk/9812
S
Sun, M. , Fleming, A. , Motawa, I. and Senaratne, S.
(2006)
A change management toolkit for construction projects.
Architectural Engineering and Design Management, 2 (4).
pp. 261-271.
ISSN 1752-7589
Available from: http://eprints.uwe.ac.uk/6032
Y
Yakubu, O. A. and Sun, M.
(2010)
Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice.
Construction Management and Economics, 28 (5).
pp. 509-526.
ISSN 0144-6193
Available from: http://eprints.uwe.ac.uk/10716
This list was generated on Tue Mar 19 06:00:27 2024 GMT.