Menu
Login to UWE

Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: Article
Number of items: 1.

Article

Clark, A., Morabito, R. and Toso, E. A. V. (2010) Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching. Journal of Scheduling, 13 (2). pp. 111-121. ISSN 1094-6136 Available from: http://eprints.uwe.ac.uk/11355

This list was generated on Sun Jun 26 03:34:17 2016 BST.

 

Copyright 2016 © UWE better together