| Login |
Items where School or Centre is "~Pre-2010 Faculty Structure > Environment and Technology > Bristol Institute of Technology > Applied Mathematics Group" and Year is UNSPECIFIED
Jump to: M Number of items: 1. MMenezes, A. A. , Clark, A. and Almada-Lobo, B. (2011) Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups. Journal of Scheduling, 14 (2). pp. 209-219. ISSN 1094-6136 |











