Number of items: 12. HHarris, F. , Ambrose, B. , Olomolaiye, P. and Proverbs, D. (1995) An evaluation of construction productivity using European construction industry data. In: Proceedings of the EASEC-5 Conference, Australia, 1995. Available from: http://eprints.uwe.ac.uk/20371 Holt, G. , Olomolaiye, P. and Harris, F. C. (1995) A review of contractor selection practices in the UK construction industry. Building and Environment, 30 (4). pp. 553-561. ISSN 0360-1323 Available from: http://eprints.uwe.ac.uk/20000 Holt, G. D. , Olomolaiye, P. and Harris, F. C. (1995) Application of alternative contractor selection model. Building Research and Information, 23 (5). pp. 255-264. ISSN 0961-3218 Available from: http://eprints.uwe.ac.uk/20002 KKometa, S. T. , Olomolaiye, P. and Harris, F. C. (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13 (2). pp. 137-147. ISSN 0144-6193 Available from: http://eprints.uwe.ac.uk/19991 Kometa, S. T. , Olomolaiye, P. and Harris, F. C. (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering Construction and Architectural Management, 2 (1). pp. 57-76. ISSN 0969-9988 Available from: http://eprints.uwe.ac.uk/20004 OOlomolaiye, P. (1995) Client evaluation and construction project management. In: Proceedings of the First International Conference on Construction Project Management - Innovation and Dynamism for Future Prosperity, Nanyang Technological University, Singapore, 1995., pp. 301-307 Available from: http://eprints.uwe.ac.uk/20353 Olomolaiye, P. (1995) Client evaluation and construction project management. In: First International Conference on Construction Project Management, Singapore, 11th - 12th January, 1995. Available from: http://eprints.uwe.ac.uk/20366 Olomolaiye, P. (1995) Cost of high rise construction in Indonesia. In: Proceedings of the 11th Annual Association of Researchers in Construction Management (ARCOM Conference), 1995. Available from: http://eprints.uwe.ac.uk/20338 Olomolaiye, P. (1995) Project success and pre-contract client evaluation. In: Proceedings of the Eleventh Annual ARCOM Conference, University of York, UK, 1995. Available from: http://eprints.uwe.ac.uk/20355 Olomolaiye, P. (1995) An evaluation of construction productivity using European construction industry data. In: Proceedings of the EASEC - 5 Conference, Australia, 1995. Available from: http://eprints.uwe.ac.uk/20358 PProverbs, D. , Olomolaiye, P. and Harris, F. (1995) Organisational productivity - a case study of materials management in UK construction firms. Construction Papers (No.44). Available from: http://eprints.uwe.ac.uk/19992 WWood, S. , Worthing, D. and Hobbs, P. (1995) An international typology of post occupancy evaluations. In: RICS Cutting Edge Conference, Aberdeen, UK, September, 1995. Available from: http://eprints.uwe.ac.uk/14834 |