Number of items: 16. CChinyio, E. A. , Olomolaiye, P. and Corbett, P. (1998) Quantification of construction clients' needs through paired comparisons. Journal of Management in Engineering, 14 (1). pp. 87-92. ISSN 0742-597X Available from: http://eprints.uwe.ac.uk/20045 Chinyio, E. A. , Olomolaiye, P. and Corbett, P. (1998) An evaluation of the project needs of UK building clients. International Journal of Project Management, 16 (6). pp. 385-391. ISSN 0263-7863 Available from: http://eprints.uwe.ac.uk/20048 Chinyio, E. A. , Olomolaiye, P. , Kometa, S. T. and Harris, F. C. (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16 (1). pp. 91-98. ISSN 0144-6193 Available from: http://eprints.uwe.ac.uk/20044 DDann, N. and Worthing, D. (1998) How to ensure conservation through good maintenance. Chartered Surveyor Monthly. Available from: http://eprints.uwe.ac.uk/14851 Dann, N. and Worthing, D. (1998) Sustainability and the built cultural heritage in the UK. In: The City - Historic and the Present, Szczecin, Poland, June, 1998. Available from: http://eprints.uwe.ac.uk/14837 Dann, N. , Worthing, D. and Bond, S. (1998) Conservation maintenance management: Establishing a research agenda. Structural Survey, 17 (3). pp. 143-135. ISSN 0263-080X Available from: http://eprints.uwe.ac.uk/14643 HHarvey, W. and Tomor, A. (1998) Calculating load capacity for masonry arch bridges with spreadsheet computational mechanics. In: ACME Annual Conference, Exeter, UK, 1998. Available from: http://eprints.uwe.ac.uk/13246 KKaming, P. F. , Holt, G. D. , Kometa, S. T. and Olomolaiye, P. (1998) Severity diagnosis of productivity problems - A reliability diagnosis. International Journal of Project Management, 16 (2). pp. 107-113. ISSN 0263-7863 Available from: http://eprints.uwe.ac.uk/20240 Kaming, P. F. , Olomolaiye, P. , Holt, G. D. and Harris, F. C. (1998) What motivates construction craftsmen in developing countries? A case study of Indonesia. Building and Environment, 33 (2). pp. 131-141. ISSN 0360-1323 Available from: http://eprints.uwe.ac.uk/20241 MMarshall, D. and Worthing, D. (1998) Stock condition surveys. Project Report. The Housing Corporation. Available from: http://eprints.uwe.ac.uk/14849 OOlomolaiye, P. , Jayawardane, A. and Harris, F. (1998) Construction productivity management. Longman. ISBN 9780582096035 Available from: http://eprints.uwe.ac.uk/18456 PProverbs, D. , Holt, G. D. and Olomolaiye, P. (1998) Scaffolding for high-rise concrete construction: A french, german and UK comparison. Proceedings of the ICE - Structures and Buildings, 128 (1). pp. 59-66. ISSN 0965-0911 Available from: http://eprints.uwe.ac.uk/20239 Proverbs, D. , Holt, G. D. and Olomolaiye, P. (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering Construction and Architectural Management, 5 (2). pp. 174-181. ISSN 0969-9988 Available from: http://eprints.uwe.ac.uk/20238 Proverbs, D. , Holt, G. D. and Olomolaiye, P. (1998) A comparative evaluation of planning engineers' formwork productivity rates in European construction. Building and Environment, 33 (4). pp. 181-187. ISSN 0360-1323 Available from: http://eprints.uwe.ac.uk/20046 WWorthing, D. , Dann, N. and Bond, S. (1998) Sustainable development and the built cultural heritage. In: City and Culture Conference, Stockholm, Sweden, May, 1998. Available from: http://eprints.uwe.ac.uk/14836 Worthing, D. and Marshall, D. (1998) Guide to energy efficiency. Project Report. The Housing Corporation. Available from: http://eprints.uwe.ac.uk/14848 |